Round Rock ISD

Track and Field Events Resurfacing.

Resurface of the running track, installation of field drainage system.

Products Used: Installation of new NRG 200- Black Structural Spray System.

Del Valle ISD

Ojeda Middle School – Track and Field Renovations

Demolition of existing track surface, concrete curb, asphalt and underlaying base at specified areas. Construct new curbing, track base and asphalt paving. New curb abutments.

Products Used: Install NRG 300 Impermeable Structural Spray System