Owasso High School Public Schools

Owasso Public Schools Athletic Renovations- Running Track and Synthetic Turf Football Field.

Construction of new multipurpose synthetic turf field, featuring ActGlobal F57 Xtreme turf. NRG 200 – Red Structural Spray was installed on the running track, field events and new “D” area

Montgomery County Detention Center

Woodlands ICE  Detention Center

New Construction of artificial turf Soccer field, including excavation, soil stabilization, drainage stone, laser grade and compaction.

Installing Synthetic Turf System.

 

Plainview High School

New Stadium Turf and Track

Demolition of existing natural field and track. New Construction of artificial turf soccer/football field and running track, including excavation, soil stabilization, new drainage system, concrete mow strip and chain link fences.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system.

Lumberton High School

New Stadium Turf and Track

Demolition of Existing natural field and track. New Construction of artificial turf soccer/football field and running track including excavation, soil stabilization, new drainage system, concrete mow strip and chain-link fences.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

Brickell Soccer Roof Top

Prepared existing base for new pad and synthetic turf.  Provided and installed new drain mat/shock pad over existing base, provided and installed new GSS NF- none infill synthetic turf system with all lines and markings as required for competition soccer.