Newkirk High School

New Track and Field Events Synthetic Surface

Demolition of running track surface and field events, furnish and install 4″ of new asphalt on the track area.

Products Used: Installation of NRG 500 Impermeable Sandwich System on running track and field events.

Lufkin High School- Abe Martin Stadium

Track Repair at Abe Martin Stadium

Demolition of running track surface and field events. Mill existing asphalt at designated track areas. Lay a new 1.5″ layer of asphalt on designated areas to replace milled areas of the track surface. Remove existing take off boards than, Furnish and install new take off boards.

Products Used: Install NRG 200 Structural Spray System at designated track and field areas.

Owasso High School

Owasso High School Football Stadium – New Stadium Synthetic Turf.

Remove and properly disposed of existing artificial synthetic turf from entire field area, Excavate existing soil and import or export to meet subgrade elevations as required, Protect existing drainage during the progress of construction.

Owasso High School – Indoor Practice Field

Owasso Public Schools Athletic Renovations- Indoor Facility

Remove and properly dispose of existing synthetic turf on indoor facility. Installation of multipurpose F50 ActGlobal Xtreme Turf Synthetic Turf System and Mondo Super X track surface.

Montgomery County Detention Center

Woodlands ICE  Detention Center

New Construction of artificial turf Soccer field, including excavation, soil stabilization, drainage stone, laser grade and compaction.

Installing Synthetic Turf System.

 

Plainview High School

New Stadium Turf and Track

Demolition of existing natural field and track. New Construction of artificial turf soccer/football field and running track, including excavation, soil stabilization, new drainage system, concrete mow strip and chain link fences.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system.

Plainview ISD

New Stadium  Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system

Lumberton ISD

New Stadium Running Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

 

Olle Middle School- Alief ISD

Running Track Renovations and Resurfacing.

Demolition of running track surface, and construction of new track curbs.

Products Used: NRG 200 Structural Spray System