Owasso High School Public Schools

Owasso Public Schools Athletic Renovations- Running Track and Synthetic Turf Football Field.

Construction of new multipurpose synthetic turf field, featuring ActGlobal F57 Xtreme turf. NRG 200 – Red Structural Spray was installed on the running track, field events and new “D” area

Prague High School

Prague Public Schools Track Replacement.

Demolition of Running track Surface and field events.

Products Used: Install NRG 200- Red Structural Spray System on running track and field events.

Newkirk High School

New Track and Field Events Synthetic Surface

Demolition of running track surface and field events, furnish and install 4″ of new asphalt on the track area.

Products Used: Installation of NRG 500 Impermeable Sandwich System on running track and field events.

Lufkin High School- Abe Martin Stadium

Track Repair at Abe Martin Stadium

Demolition of running track surface and field events. Mill existing asphalt at designated track areas. Lay a new 1.5″ layer of asphalt on designated areas to replace milled areas of the track surface. Remove existing take off boards than, Furnish and install new take off boards.

Products Used: Install NRG 200 Structural Spray System at designated track and field areas.

Coweta High School

Coweta High School Track Renovations and Resurfacing.

Demolition of running track surface, construction of new running track curbs.

Products Used: NRG 500 impermeable Sandwich System

Warner High School

High School Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new running track curbs.

Products Used: Installation of NRG Polyurethane Base Mat System

Frenship Middle School

New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems.

Lake Travis Middle School

Middle School Track Additions

Construction of new long jump, triple jump and pole vault field events.

Product Used: Installation of BS-Base Mat System and Structural Spray System.

Olney High School

Onley High  School

Mobilization and Removal of existing rubberized surface, remove and dispose off-site existing high jump, Lime stabilization at running track area.
Construct new inside and outside track curbs. Furnish and install  aggregate base to track and provide grade and compaction. Furnish and install 2″ of asphalt to running track.

Construct concrete high jump.Construct north D area with asphalt and 265 LF of Aco drain