North Rock Creek
Installation of NRG Track 200 Structural Spray System.
Installation of NRG Track 200 Structural Spray System.
Track and Field Events Resurfacing
PRODUCTS USED: NRG 200 Red Structural Spray System and Striping at the existing running track and field events areas.
New Stadium Running Track
Demolition of existing track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.
Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.
High School Track Renovations and Resurfacing.
Demolition of running track surface, Construction of new running track curbs.
Products Used: Installation of NRG Polyurethane Base Mat System
Track and Field Events Resurfacing
Products Used: Installation of NRG 300- Black Impermeable Structural Spray System. Striping at the existing 6 lane running track and field events areas.
Ojeda Middle School – Track and Field Renovations
Demolition of existing track surface, concrete curb, asphalt and underlaying base at specified areas. Construct new curbing, track base and asphalt paving. New curb abutments.
Products Used: Install NRG 300 Impermeable Structural Spray System
New District Track Renovations and Resurfacing.
Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.
Products Used: Installation of three NRG 200 Structural Spray Systems.
Frenship ISD – New District Track Renovations and Resurfacing.
Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.
Products Used: Installation of three NRG 200 Structural Spray Systems
Onley High School
Mobilization and Removal of existing rubberized surface, remove and dispose off-site existing high jump, Lime stabilization at running track area.
Construct new inside and outside track curbs. Furnish and install aggregate base to track and provide grade and compaction. Furnish and install 2″ of asphalt to running track.
Construct concrete high jump.Construct north D area with asphalt and 265 LF of Aco drain