Prague High School

Prague Public Schools Track Replacement.

Demolition of Running track Surface and field events.

Products Used: Install NRG 200- Red Structural Spray System on running track and field events.

Plainview ISD

New Stadium  Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system

Lumberton ISD

New Stadium Running Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

 

Round Rock ISD

Track and Field Events Resurfacing.

Resurface of the running track, installation of field drainage system.

Products Used: Installation of new NRG 200- Black Structural Spray System.