Plainview ISD

New Stadium  Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system

Heritage Middle School

Frenship ISD – New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems

Terra Vista Middle School

Frenship ISD – New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems.

Olney High School

Onley High  School

Mobilization and Removal of existing rubberized surface, remove and dispose off-site existing high jump, Lime stabilization at running track area.
Construct new inside and outside track curbs. Furnish and install  aggregate base to track and provide grade and compaction. Furnish and install 2″ of asphalt to running track.

Construct concrete high jump.Construct north D area with asphalt and 265 LF of Aco drain