Frenship Middle School

New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems.

Heritage Middle School

Frenship ISD – New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems

Terra Vista Middle School

Frenship ISD – New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems.

Brickell Soccer Roof Top

Prepared existing base for new pad and synthetic turf.  Provided and installed new drain mat/shock pad over existing base, provided and installed new GSS NF- none infill synthetic turf system with all lines and markings as required for competition soccer.

White Oak ISD

White Oak ISD  Track Replacement.

Demolition of running track surface and field events. 

Products Used: Install NRG 200- Black Structural Spray System on running track and field events.

Abilene Christian University

Baseball and Softball Synthetic Turf Renovations

Demolition of existing natural grass fields, baseball and softball field base construction including fine subgrade, drainage system, drainage stone layer to receive synthetic turf. Construction of new baseball  mound and baseball bases.

Harmony School of Science- Euless

New Soccer Turf Field

Demolition of existing natural grass field.  Construction of artificial turf field including excavation, demolition, new drainage systems, filter rock and SlideMax XP 50 Synthetic Turf Installation.

Lake Travis Middle School

Middle School Track Additions

Construction of new long jump, triple jump and pole vault field events.

Product Used: Installation of BS-Base Mat System and Structural Spray System.

Westlake High School

Eanes ISD- Field Replacements at 2 Practice Fields

Demolition of existing synthetic turf fields. Regrade existing synthetic turf bases, Nailer boards.

Products Used: Installation of 19mm E-Layer with FieldTurf Field Installed.

Crowley High School- Softball Field

CHS Baseball and Softball Fields

Demolition of existing natural fields, baseball and softball field base construction including fine subgrade, drainage system, drainage stone layer to receive synthetic turf.

Construction of concrete mow strip, chain-link and metal fencing and synthetic turf bases.