Owasso High School – Indoor Practice Field

Owasso Public Schools Athletic Renovations- Indoor Facility

Remove and properly dispose of existing synthetic turf on indoor facility. Installation of multipurpose F50 ActGlobal Xtreme Turf Synthetic Turf System and Mondo Super X track surface.

Montgomery County Detention Center

Woodlands ICE  Detention Center

New Construction of artificial turf Soccer field, including excavation, soil stabilization, drainage stone, laser grade and compaction.

Installing Synthetic Turf System.

 

Plainview High School

New Stadium Turf and Track

Demolition of existing natural field and track. New Construction of artificial turf soccer/football field and running track, including excavation, soil stabilization, new drainage system, concrete mow strip and chain link fences.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system.

Plainview ISD

New Stadium  Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system

Lumberton ISD

New Stadium Running Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

 

Olle Middle School- Alief ISD

Running Track Renovations and Resurfacing.

Demolition of running track surface, and construction of new track curbs.

Products Used: NRG 200 Structural Spray System

Coweta High School

Coweta High School Track Renovations and Resurfacing.

Demolition of running track surface, construction of new running track curbs.

Products Used: NRG 500 impermeable Sandwich System

Checotah Public Schools

Track and Field Events Resurfacing

Products Used: Installation of NRG 300- Black Impermeable Structural Spray System. Striping at the existing 6 lane running track and field events areas. 

Lumberton High School

New Stadium Turf and Track

Demolition of Existing natural field and track. New Construction of artificial turf soccer/football field and running track including excavation, soil stabilization, new drainage system, concrete mow strip and chain-link fences.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

Round Rock ISD

Track and Field Events Resurfacing.

Resurface of the running track, installation of field drainage system.

Products Used: Installation of new NRG 200- Black Structural Spray System.