Prague High School

Prague Public Schools Track Replacement.

Demolition of Running track Surface and field events.

Products Used: Install NRG 200- Red Structural Spray System on running track and field events.

Newkirk High School

New Track and Field Events Synthetic Surface

Demolition of running track surface and field events, furnish and install 4″ of new asphalt on the track area.

Products Used: Installation of NRG 500 Impermeable Sandwich System on running track and field events.

Lufkin High School- Abe Martin Stadium

Track Repair at Abe Martin Stadium

Demolition of running track surface and field events. Mill existing asphalt at designated track areas. Lay a new 1.5″ layer of asphalt on designated areas to replace milled areas of the track surface. Remove existing take off boards than, Furnish and install new take off boards.

Products Used: Install NRG 200 Structural Spray System at designated track and field areas.

Plainview ISD

New Stadium  Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system

Lumberton ISD

New Stadium Running Track

Demolition of existing  track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

 

Olle Middle School- Alief ISD

Running Track Renovations and Resurfacing.

Demolition of running track surface, and construction of new track curbs.

Products Used: NRG 200 Structural Spray System

Coweta High School

Coweta High School Track Renovations and Resurfacing.

Demolition of running track surface, construction of new running track curbs.

Products Used: NRG 500 impermeable Sandwich System

Warner High School

High School Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new running track curbs.

Products Used: Installation of NRG Polyurethane Base Mat System

Round Rock ISD

Track and Field Events Resurfacing.

Resurface of the running track, installation of field drainage system.

Products Used: Installation of new NRG 200- Black Structural Spray System.