Montgomery County Detention Center

Woodlands ICE  Detention Center

New Construction of artificial turf Soccer field, including excavation, soil stabilization, drainage stone, laser grade and compaction.

Installing Synthetic Turf System.

 

Plainview High School

New Stadium Turf and Track

Demolition of existing natural field and track. New Construction of artificial turf soccer/football field and running track, including excavation, soil stabilization, new drainage system, concrete mow strip and chain link fences.

Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system.

Lumberton High School

New Stadium Turf and Track

Demolition of Existing natural field and track. New Construction of artificial turf soccer/football field and running track including excavation, soil stabilization, new drainage system, concrete mow strip and chain-link fences.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

Brickell Soccer Roof Top

Prepared existing base for new pad and synthetic turf.  Provided and installed new drain mat/shock pad over existing base, provided and installed new GSS NF- none infill synthetic turf system with all lines and markings as required for competition soccer.

Abilene Christian University

Baseball and Softball Synthetic Turf Renovations

Demolition of existing natural grass fields, baseball and softball field base construction including fine subgrade, drainage system, drainage stone layer to receive synthetic turf. Construction of new baseball  mound and baseball bases.

Harmony School of Science- Euless

New Soccer Turf Field

Demolition of existing natural grass field.  Construction of artificial turf field including excavation, demolition, new drainage systems, filter rock and SlideMax XP 50 Synthetic Turf Installation.

Crowley High School- Softball Field

CHS Baseball and Softball Fields

Demolition of existing natural fields, baseball and softball field base construction including fine subgrade, drainage system, drainage stone layer to receive synthetic turf.

Construction of concrete mow strip, chain-link and metal fencing and synthetic turf bases.

Concordia University

New Softball Field

New softball field base construction including fine subgrade, drainage system and drainage stone layer to receive synthetic turf.

Fannin Middle School

Amarillo ISD Middle School Campuses Synthetic Turf Fields

Fannin Middle School

Mobilization and demolition of existing natural grass field . Field base construction including fine subgrade, concrete curbs, drainage system and drainage stone layer to receive synthetic turf.

Provided and installed new goal pack with soccer goal and 8′  goal posts w/ 20 uprights at new field.

Argyle High School

Argyle High School Baseball Synthetic Turf Field Renovations.

Demolition of existing natural grass field, baseball field base construction including fine subgrade, drainage system, drainage stone layer to receive synthetic turf. Construction of concrete mow strip, chain-link and metal fencing and synthetic turf bases.