Greenhill School
Installation of NRG Track 500 Impermeable Sandwich System.
Installation of NRG Track 500 Impermeable Sandwich System.
Installation of NRG Track 200 – Structural Spray System.
Installation of NRG Track 200 –Structural Spray System.
Installation of NRG Track 300 – Impermeable Structural Spray System.
Installation of NRG Track 200 –Structural Spray System.
West Hardin County CISD – 400 Meter Track Resurface and Field Event
Demolition of existing running track and construction of a new 8 lane running track and field events, installation of track surface
Products Used: NRG 300 – Impermeable Structural Spray System.
Track and Field Events Resurfacing
PRODUCTS USED: NRG 200 Red Structural Spray System and Striping at the existing running track and field events areas.
New Stadium Track
Demolition of existing track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.
Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system
Ojeda Middle School – Track and Field Renovations
Demolition of existing track surface, concrete curb, asphalt and underlaying base at specified areas. Construct new curbing, track base and asphalt paving. New curb abutments.
Products Used: Install NRG 300 Impermeable Structural Spray System
Frenship ISD – New District Track Renovations and Resurfacing.
Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.
Products Used: Installation of three NRG 200 Structural Spray Systems