Pilot Point Middle School- Running Track
Installation of NRG Track 200 –Structural Spray System.
Installation of NRG Track 200 –Structural Spray System.
Six lane running track and D areas, black rejuvenation resurfacing. Installation of track surface NRG 200- Structural System Resurfacing.
Installation of NRG Track 200 –Structural Spray System .
West Hardin County CISD – 400 Meter Track Resurface and Field Event
Demolition of existing running track and construction of a new 8 lane running track and field events, installation of track surface
Products Used: NRG 300 – Impermeable Structural Spray System.
Installation of NRG Track 200 –Structural Spray System.
New Track and Field Events Synthetic Surface
Demolition of running track surface and field events, furnish and install 4″ of new asphalt on the track area.
Products Used: Installation of NRG 500 Impermeable Sandwich System on running track and field events.
Track Repair at Abe Martin Stadium
Demolition of running track surface and field events. Mill existing asphalt at designated track areas. Lay a new 1.5″ layer of asphalt on designated areas to replace milled areas of the track surface. Remove existing take off boards than, Furnish and install new take off boards.
Products Used: Install NRG 200 Structural Spray System at designated track and field areas.
Installation of NRG Track 200 –Structural Spray System.
Products Used: Install NRG 200 Structural Spray System at running track and field events.
Track and Field Events Resurfacing
PRODUCTS USED: NRG 200 Red Structural Spray System and Striping at the existing running track and field events areas.