Putman City West

Six lane running track and D areas, black rejuvenation resurfacing. Installation of track surface NRG 200- Structural System Resurfacing.

West Hardin High School

West Hardin County CISD – 400 Meter Track Resurface and Field Event

Demolition of existing running track and construction of a new 8 lane running track and field events, installation of track surface

Products Used: NRG 300 – Impermeable Structural Spray System.

Newkirk High School

New Track and Field Events Synthetic Surface

Demolition of running track surface and field events, furnish and install 4″ of new asphalt on the track area.

Products Used: Installation of NRG 500 Impermeable Sandwich System on running track and field events.

Lufkin High School- Abe Martin Stadium

Track Repair at Abe Martin Stadium

Demolition of running track surface and field events. Mill existing asphalt at designated track areas. Lay a new 1.5″ layer of asphalt on designated areas to replace milled areas of the track surface. Remove existing take off boards than, Furnish and install new take off boards.

Products Used: Install NRG 200 Structural Spray System at designated track and field areas.

University of the Incarnate Word

Track and Field Events Resurfacing

PRODUCTS USED: NRG 200 Red Structural Spray System and Striping at the existing running track and field events areas.