Putman City West
Six lane running track and D areas, black rejuvenation resurfacing. Installation of track surface NRG 200- Structural System Resurfacing.
Six lane running track and D areas, black rejuvenation resurfacing. Installation of track surface NRG 200- Structural System Resurfacing.
Installation of NRG Track 200 –Structural Spray System.
Track Repair at Abe Martin Stadium
Demolition of running track surface and field events. Mill existing asphalt at designated track areas. Lay a new 1.5″ layer of asphalt on designated areas to replace milled areas of the track surface. Remove existing take off boards than, Furnish and install new take off boards.
Products Used: Install NRG 200 Structural Spray System at designated track and field areas.
Installation of NRG Track 200 –Structural Spray System.
Track and Field Events Resurfacing
PRODUCTS USED: NRG 200 Red Structural Spray System and Striping at the existing running track and field events areas.
New Stadium Track
Demolition of existing track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.
Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system
New Stadium Running Track
Demolition of existing track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.
Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.
Track and Field Events Resurfacing.
Resurface of the running track, installation of field drainage system.
Products Used: Installation of new NRG 200- Black Structural Spray System.
Ojeda Middle School – Track and Field Renovations
Demolition of existing track surface, concrete curb, asphalt and underlaying base at specified areas. Construct new curbing, track base and asphalt paving. New curb abutments.
Products Used: Install NRG 300 Impermeable Structural Spray System
Frenship ISD – New District Track Renovations and Resurfacing.
Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.
Products Used: Installation of three NRG 200 Structural Spray Systems