Edmond Santa Fe High School Track
Installation of NRG Track 200 –Structural Spray System .
Installation of NRG Track 200 –Structural Spray System .
Installation of NRG Track 200 –Structural Spray System.
New Track and Field Events Synthetic Surface
Demolition of running track surface and field events, furnish and install 4″ of new asphalt on the track area.
Products Used: Installation of NRG 500 Impermeable Sandwich System on running track and field events.
Track Repair at Abe Martin Stadium
Demolition of running track surface and field events. Mill existing asphalt at designated track areas. Lay a new 1.5″ layer of asphalt on designated areas to replace milled areas of the track surface. Remove existing take off boards than, Furnish and install new take off boards.
Products Used: Install NRG 200 Structural Spray System at designated track and field areas.
Products Used: Install NRG 200 Structural Spray System at running track and field events.
Track and Field Events Resurfacing
PRODUCTS USED: NRG 200 Red Structural Spray System and Striping at the existing running track and field events areas.
New Stadium Track
Demolition of existing track, full construction of running track including laser grading, construction of concrete perimeter curbs, construction of Long Jump/ Triple Jump Sand Pits and asphalt laying.
Products Used: NRG 500 Impermeable Sandwich System and Greenfields SlideMax 60 monofilament turf system
Running Track Renovations and Resurfacing.
Demolition of running track surface, and construction of new track curbs.
Products Used: NRG 200 Structural Spray System
Coweta High School Track Renovations and Resurfacing.
Demolition of running track surface, construction of new running track curbs.
Products Used: NRG 500 impermeable Sandwich System
High School Track Renovations and Resurfacing.
Demolition of running track surface, Construction of new running track curbs.
Products Used: Installation of NRG Polyurethane Base Mat System