Olle Middle School- Alief ISD

Running Track Renovations and Resurfacing.

Demolition of running track surface, and construction of new track curbs.

Products Used: NRG 200 Structural Spray System

Coweta High School

Coweta High School Track Renovations and Resurfacing.

Demolition of running track surface, construction of new running track curbs.

Products Used: NRG 500 impermeable Sandwich System

Warner High School

High School Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new running track curbs.

Products Used: Installation of NRG Polyurethane Base Mat System

Checotah Public Schools

Track and Field Events Resurfacing

Products Used: Installation of NRG 300- Black Impermeable Structural Spray System. Striping at the existing 6 lane running track and field events areas. 

Lumberton High School

New Stadium Turf and Track

Demolition of Existing natural field and track. New Construction of artificial turf soccer/football field and running track including excavation, soil stabilization, new drainage system, concrete mow strip and chain-link fences.

Products used: Install new Brock Pad, Greenfields SlideMax 60 Monofilament turf system and NRG 200 Structural Spray System.

Round Rock ISD

Track and Field Events Resurfacing.

Resurface of the running track, installation of field drainage system.

Products Used: Installation of new NRG 200- Black Structural Spray System.

Del Valle ISD

Ojeda Middle School – Track and Field Renovations

Demolition of existing track surface, concrete curb, asphalt and underlaying base at specified areas. Construct new curbing, track base and asphalt paving. New curb abutments.

Products Used: Install NRG 300 Impermeable Structural Spray System

Frenship Middle School

New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems.

Heritage Middle School

Frenship ISD – New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems

Terra Vista Middle School

Frenship ISD – New District Track Renovations and Resurfacing.

Demolition of running track surface, Construction of new rock base and asphalt running track base, construction of running track curbs.

Products Used: Installation of three NRG 200 Structural Spray Systems.