White Oak ISD

White Oak ISD  Track Replacement.

Demolition of running track surface and field events. 

Products Used: Install NRG 200- Black Structural Spray System on running track and field events.

Lake Travis Middle School

Middle School Track Additions

Construction of new long jump, triple jump and pole vault field events.

Product Used: Installation of BS-Base Mat System and Structural Spray System.

Olney High School

Onley High  School

Mobilization and Removal of existing rubberized surface, remove and dispose off-site existing high jump, Lime stabilization at running track area.
Construct new inside and outside track curbs. Furnish and install  aggregate base to track and provide grade and compaction. Furnish and install 2″ of asphalt to running track.

Construct concrete high jump.Construct north D area with asphalt and 265 LF of Aco drain